Bradford College
Location: Bradford
Client: CBRE
Bradford College have a large and attractive atrium area that required extensive work to both breathe new life into this well used area and also replace all glass in the large skylight roof. Glazing Renovations carried out a full site survey and assessment, gathering requirements to replace all glass and associated materials.
Our highly experienced team worked closely with Bradford College to arrange a convenient time to be on site to complete this extensive work with minimal disruption. All cracked or broken Georgian wire glass and glass panels were carefully removed and disposed. New Acid etch white toughened Laminated Glass panels were delivered to the site and installed by our skilled on-site team. Whilst replacing all the glass, all the glazing bars were replaced with updated white PPC RAL 9010 and matching capping and gaskets.
This work not only gave the atrium and building a new modern look, it also made excellent use of the latest laminated glass panels, bar materials, was completed on time and completed an up to date look for this vast and well-used space.